One workflow first. The map after.
The Baseline covers the workflow carrying your next decision, at a fixed price agreed before anything starts. What it surfaces decides whether a Full Map follows, and that one is quoted.
FREE · NO ACCOUNT
Proof check
Six questions · two minutes · nothing sent, nothing stored
Free
Run the check →Six questions on what already runs. Your answers come back to you as a text you can take away — into an email, to your leadership, or to your next meeting. It concludes nothing, and nothing is sent to us.
- ✓Six questions on the AI uses already running
- ✓Your own answers, returned grouped and readable
- ✓A text you can copy and take away
- ✓On screen immediately, no account, no email
- ✓No verdict: it concludes nothing about you
Analysis
Baseline
One-time · excl. VAT 21% · readout included · calibrated for an SME
€3,900
one-time
One workflow examined end to end: who does what, where the hand-offs sit, and where what you describe and the available elements disagree. You get a picture of your own map, and of the distance between it and what the elements show — which is the first thing worth putting in front of your teams, precisely because they will correct it.
It ends on one of three
- A Full Map is warranted · The elements show a distance wide enough that examining further would change the decision.
- It is warranted on one point · The distance is real but concentrated somewhere identifiable, and that point can be dealt with on its own.
- Nothing further is warranted · What you describe and what the elements show agree, within the limits of a single source — or no dated decision depends on the distance. We say so, and that is the end of it.
If the analysis does not cover the workflow we agreed on, full refund. A finding whose source cannot be produced is withdrawn; if that withdrawal changes the report's outcome, the engagement is refunded.
Check the fit →Already qualified? Pay now →We confirm the scope with you before starting. If the fit is not there, we say so.
- ✓Scope: one workflow, the one you designate, agreed with you before anything starts
- ✓Interviews: with you alone — your teams are interviewed at Full Map, which is what it adds
- ✓Elements, and this is where it starts: five families over twelve months — tool invoicing, dated outputs (exports, version histories, logs), internal writings (procedure, charter, minutes), configuration (active subscriptions, authorisations, extensions), correspondence (email threads, tickets)
- ✓Analysis: the distance between what the elements establish and what you describe of it
- ✓The chain, not the list: each use followed from human input to used output
- ✓Named authority, or its absence: who decides, approves, can interrupt
- ✓Four evidence statuses on every finding: confirmed · declared without an independent trace · gap · open question
- ✓A gap is only presented as established once a second source, of a different kind, confirms it
- ✓What must be decided: the open question, the observed owner, and a deadline when a dated fact of yours carries one
- ✓An expiry date per family of findings, not one general mention
- ✓One of three outcomes, including the one concluding that no follow-up is warranted
- ✓Deliverable: written report, plus a sixty-minute readout
- ✓Verifiable badge on /verify, valid 30 days — how long the reconstruction still describes the present
- ✓Scope guarantee: full refund if the report does not cover the workflow agreed in writing
- ✓Traceability guarantee: a finding whose source cannot be produced is withdrawn, and if that withdrawal changes the outcome, the engagement is refunded
- ✓Timing: 5 business days from the close of collection
ON QUOTE
Full Map
From €9,900 · excl. VAT 21% · includes the Baseline
From €9,900
on quote
The Baseline measures the distance on the workflow you designate, with you alone, and concludes whether there is reason to look further. The Full Map looks: it opens to the three or four people who actually run the work, which gives access to what a single source cannot see — the other workflows, the numbers only those doing the work can estimate, and the gap document.
Talk to us →Two ways in, and only two. Either the Baseline alone, or the Full Map, which includes the Baseline. If you have already had the Baseline done, it is not redone and not billed twice: you pay the difference. The total is the same either way, and the Baseline is never discounted. Quoted case by case, because the effort scales with the number of critical points rather than spreading across them. Delivered 10 business days from the close of collection.
This term is defined in the lexicon, with the standing of its source — Structural incompatibility. Read the definition
This term is defined in the lexicon, with the standing of its source — Portable skill. Read the definition
This term is defined in the lexicon, with the standing of its source — First-pass acceptance rate. Read the definition
- ✓Scope: the critical workflows, identified here and not assumed from the Baseline
- ✓People: you and the three or four who actually run the work — which is what makes the rest possible
- ✓The other workflows: what a single source could not see, surveyed rather than inferred
- ✓First-pass acceptance rate and rework minutes, estimated by the people doing the work
- ✓The gap document: where what is described and what the elements show do not agree
- ✓Structural incompatibilities: where two tools adopted separately will collide when their data meets
- ✓The portable share of the skill: what would survive a change of tool
- ✓Findings: each one carries its evidence status, as in the Baseline
- ✓What must be decided: open questions, observed owners, deadlines drawn from dated facts of yours
- ✓An expiry date per family of findings, not one general mention
- ✓Timing: 10 business days from the close of collection
FOLLOW-UP
Periodic re-analysis
Requires a delivered Baseline · monthly · price and content agreed before the first period starts
In conversation
price agreed with you
One pass does not reconstruct everything, and that is not something we hold back. A survey is bounded by what your elements establish on a given date. What your organisation does not yet detect itself leaves no trace to read, and no pass, however complete, makes visible what left no trace at all. A workflow moves as well: tools get added, people change roles, exceptions become the norm. Monthly follow-up takes the measure again on the same scope, and what appears between two passes is dated as such. It starts thirty days after the readout, when the picture stops describing the present. We do not post a monthly figure: what it costs depends on what is actually re-examined, and we would rather set it with you than publish a number we could not defend.
Talk to us →Requires a delivered Baseline.
- ✓Scope: the same workflow, re-examined
- ✓Frequency: monthly
- ✓Content: personalised, built on what the Baseline established for you, and on the Full Map when there is one. The structure is the same for everyone, what is followed is not
- ✓What you get: what moved, what no longer holds, what is new
- ✓The methodology as updated by its dated signals at the time of the re-analysis
- ✓Each re-analysis signed and timestamped (Ed25519, RFC 3161)
- ✓Direct access to the analyst
FREQUENTLY ASKED
Not sure it applies to you?
Tell us which decision is coming and what already runs. If there is no fit, we will say so in that first conversation.
Check the fitSprinkling Act · Brussels · BCE BE 1034.962.482